MVHR installations

I try to visit the house towards the end of each working day, to inspect the day's work (and photograph as necessary). Sometimes I stay and do some work there too - the builders jokingly refer to it as the night-shift. One thing I've been doing is fitting the bathroom MVHR units. The first floor bathroom one now has all the ducts in place (though not yet sealed):

And the ground floor one is almost done - but I need the builders to core-drill the holes for the two ducts to the outside before I can put those in:

The top floor one, which will be by far the most awkward, hasn't been started yet.

Also from today:

  • 75mm PIR now largely fitted, still more taping and snagging to do
  • some more quotes have come in - we are running over-budget, but managing to claw some of the overrun back elsewhere
  • E.On rep returned my call, said they discontinued supplying Whispergen and it's effectively unavailable in the UK at present
  • My contact at Baxi returned my call, asked me to send through details of what we're proposing and he's going to get it checked out for us

 