Blog

Posted Thursday, 12 September 2013 - 11:22pm in Robert's blog

This week has seen the (belated) start of 1st fix plumbing...

Posted Tuesday, 10 September 2013 - 6:09pm in Robert's blog

The plasterers have had a productive two days on the top floor, with about 75% of the surfaces finished now. Meanwhile, the builders have been stripping and preparing the first floor rooms...

Posted Thursday, 5 September 2013 - 10:47pm in Robert's blog

With the plasterers confirmed for next week, we've been starting to plan out the painting and decorating. This lead me to calculate the sizes of areas we'll be covering:


Our PV Roof (2.7kWp of SolarCentury C21e tiles)