Since the last blog post, some things have been happening at the house, but of a non-eco variety. Most of last week the plasterers were in, and we've now got all but one of the rooms skimmed. Today, Roy the cornice man was doing some repair work to the cornices...
The builders have now started fitting UdiReco to the external rear wall of the house:
Note that the right-hand wall (with the bricked-up window) has deliberately been left, as the insulation is on the inside there. The job is waiting for scaffolding now.
The builders have been doing general making good and plasterboarding work, in preparation for the plasterers coming in and putting the skim coat on the remaining rooms...United Utilities have now opened the stretch of road in front of our house...
The plasterers have had a productive two days on the top floor, with about 75% of the surfaces finished now. Meanwhile, the builders have been stripping and preparing the first floor rooms...